svn commit: r238813 - head/sbin/geom/class/sched
Isabell Long
issyl0 at FreeBSD.org
Thu Jul 26 17:30:35 UTC 2012
Author: issyl0 (doc committer)
Date: Thu Jul 26 17:30:34 2012
New Revision: 238813
URL: http://svn.freebsd.org/changeset/base/238813
Log:
The ad(4) driver no longer exists in FreeBSD CURRENT or 9, so change the
references to it in gsched(8) to the existing ada(4) driver.
PR: docs/170085
Submitted by: olgeni
Approved by: gavin
MFC after: 5 days
Modified:
head/sbin/geom/class/sched/gsched.8
Modified: head/sbin/geom/class/sched/gsched.8
==============================================================================
--- head/sbin/geom/class/sched/gsched.8 Thu Jul 26 16:45:28 2012 (r238812)
+++ head/sbin/geom/class/sched/gsched.8 Thu Jul 26 17:30:34 2012 (r238813)
@@ -25,7 +25,7 @@
.\"
.\" $FreeBSD$
.\"
-.Dd August 29, 2010
+.Dd July 26, 2012
.Dt GSCHED 8
.Os
.Sh NAME
@@ -135,19 +135,19 @@ maximum amount of debug information is p
Exit status is 0 on success, and 1 if the command fails.
.Sh EXAMPLES
The following example shows how to create a scheduling provider for disk
-.Pa /dev/ad0 ,
+.Pa /dev/ada0 ,
and how to destroy it.
.Bd -literal -offset indent
# Load the geom_sched module:
kldload geom_sched
# Load some scheduler classes used by geom_sched:
kldload gsched_rr
-# Configure device ad0 to use scheduler "rr":
-geom sched insert -a rr ad0
-# Now provider ad0 uses the "rr" algorithm;
-# the new geom is ad0.sched.
+# Configure device ada0 to use scheduler "rr":
+geom sched insert -a rr ada0
+# Now provider ada0 uses the "rr" algorithm;
+# the new geom is ada0.sched.
# Remove the scheduler on the device:
-geom sched destroy -v ad0.sched.
+geom sched destroy -v ada0.sched.
.Ed
.Sh SEE ALSO
.Xr geom 4 ,
More information about the svn-src-head
mailing list