when i try to launch jboss thru eclipse on my bsd 6.2 machine, it gets about half way thru and then the machine powers down. as i understood bsd, it was not possible for that to happen. is there a log somewhere that i can look at to try to figure this out? i can't find anything very useful on my own. thanks